CONSTRUCTION OF A SCREW CONVEYOR WITH A SINGLE PHASE ELECTRIC MOTOR
- Department: Mechanical Engineering
- Project ID: MCE0364
- Access Fee: ₦5,000
- Pages: 35 Pages
- Reference: YES
- Format: Microsoft Word
- Views: 435
Get this Project Materials
ABSTRACT
In the society at large Technology is fast replacing the crude method of carrying out work and has been making room for employment. Besides, it has also caught the attention of the youths who will prefer to work in a company with technological operations than one with man-power operations. This project can be used to convey materials ranging from those in powdery forms grit forms, and stones in the size of crushed granites. If applied to the foundry technology practical (sand mould) under gone by the department. The lecture will experience ease in carrying out his lecture as well as satisfaction since there would not be lack of sand as this can be seen to, by an attendant and the lectures will have all the student of the Department in attendance.
TABLE OF CONTENT
Title page ii
Little of transmittal iii
Release iv
Signature v
Approval vi
Dedication vii
Acknowledgementviii
Table of contentix
Abstract xi
CHAPTER ONE
1.1Introductions1
1.2Description of the screw conveyor2
CHAPTER TWO
2.1Mode of operation 4
2.2Material selections 6
CHAPTER THREE
3.1design 7
3.2design analysis7
3.3principle of operation 9
3.4capacity of the screw conveyor 10
3.5sequence of operation/ construction 11
CHAPTER FOUR
4.1assembling of the conveyor37
4.2cost analysis 38
CHAPTER FIVE
5.1conclusions 41
5.2recommendations 41
5.3references 42
- Department: Mechanical Engineering
- Project ID: MCE0364
- Access Fee: ₦5,000
- Pages: 35 Pages
- Reference: YES
- Format: Microsoft Word
- Views: 435
Get this Project Materials