REPAIR AND REHABILITATION OF A FACULTY REFRIGERATOR


  • Department: Mechanical Engineering
  • Project ID: MCE0337
  • Access Fee: ₦5,000
  • Pages: 20 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 421
Get this Project Materials
ABSTRACT

FLUSHING OF THE CONDENSER
The refrigerant gas let into the condenser through the compressor and the vacuum pump was connected to the condenser to absorb dirty.
REFILLING OF GAS INTO THE COMPRESSOR
Gas was refilled into the compressor due to shortage of gas and it was filled inside the charging value and refrigerant.
CHANGING OF DRIVER STRAINER DUE TO BLOCKAGE
The driver strainer was change due to blockage with the help of oxygen and acetylene welding.
SPRAYING OF THE FRIDGE
The compressor was put on and the compressed air through the holes to the gun due to high pressure inside the tank. The air then forces the point out of the gun for spraying.

TABLE OF CONTENT
Title Page
Release Page
Transmittal Page
Approval Page
Abstract
Acknowledgement
Dedications
Table of content

CHAPTER ONE
Introduction

CHAPTER TWO
Literature Review

CHAPTER THREE
Tools Used

CHAPTER FOUR
Final Test and Sequence of Opera.

CHAPTER FIVE
Conclusion
Reference
Appendix Two

  • Department: Mechanical Engineering
  • Project ID: MCE0337
  • Access Fee: ₦5,000
  • Pages: 20 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 421
Get this Project Materials
whatsappWhatsApp Us