DESIGN AND CONSTRUCTION OF A REFRIGERATING UNIT


  • Department: Chemical Engineering
  • Project ID: CNG0488
  • Access Fee: ₦5,000
  • Pages: 23 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 407
Get this Project Materials
ABSTRACT
The design and construction of s refrigerating unit is handled from the knowledge of the working principles of laws of thermodynamics.
The size of the containing vessel i.e the case as established to be of 45cm by 32 cm in dimension. The Angle iron mild steel to used in the fabrication and welding. The box case of two layers are fabricated. Plastic (cooler) box is then  placed inside the upper part with the other parts of the refrigerator were brought in. they were all fixed onto a wooden base with all the connections (electrical) made.
The capacity of the refrigerator is based on the workdone by the compressor which is O.I hp in specification. The size of the components used are
i.Condenser: The size is 0.1hp and it is a plate type condenser with extended surface.
ii.Compressor: The size is 0.1hp (75 watts)
iii.Copper wire: it is of 0.5cm in diameter and the total copper wire length is about 600cm (1½ roll)
The introduction of cooling fluid and filling of the compressor enabled the compressor to start functioning when connected to electricity using a 13 AMP rated socket
The interior of the plastic box is lined with dominium box with tubes arranged in convolution around it. This world effectively and cooled the water dropped into it. It compares favorably with the ones in the market.
 
TABLE OF CONTENT
TITLE PAGE
LETTER OF TRANSMITTAL
APPROVAL/CERTIFICATION
DEDICATION
ACKNOWLDEGEMENT
ABSTRCAT
TABLE OF CONTENT

CHAPTER ONE
1.0INTRODUCTION
1.1SCOPE OF THE PROJECT

CHAPTER TWO
HISTORY OF REFRIGERATION
TYPES OF REFRIGERATING DEVICE
USES OF REFRIGERATION


CHAPTER THREE
SEQUENCE OF OPERATIONS
SELECTION OF REFRIGRANTS
CONSTRUCTION PROCEDURE
ECONOMIC ANALYSIS

CHAPTER FOUR
4.1CONCLUSION
4.2RECOMMENDATIONS
REFERENCES.

  • Department: Chemical Engineering
  • Project ID: CNG0488
  • Access Fee: ₦5,000
  • Pages: 23 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 407
Get this Project Materials
whatsappWhatsApp Us