CRISIS MANAGEMENT IN THE NIGERIAN LOCAL GOVERNMENT SYSTEM (A CASE STUDY OF ANAMBRA EAST LOCAL GOVERNMENT, NTEJE)


  • Department: Public Administration
  • Project ID: PUB0589
  • Access Fee: ₦5,000
  • Pages: 97 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1,044
Get this Project Materials
ABSTRACT
This research work is primarily aimed at examining the problems of crisis management in the Nigeria Local Government Administration council, Anambra state, was used as a case study.
The need for this research work arouse from the fact that, without properly managing the crisis that usually develop in the Local Government Administration, the goals of setting up local government areas (which aimed at bringing government to social amenities) may not be achieved even partly.
To achieve the above objectives, data was collected through the use of questionnaires.
From the analysis of data collected, it was discovered among other things that lack of adequate manpower training to understand the dynamics of crisis contributes to poor management of Crisis in Local Government administration in Nigeria.
We therefore recommend among other things that qualified staff be trained and developed through the organization of regular workshops and seminars. This will help them to be up to data in a modern crises management.                  
   
 
TABLE OF CONTENT
Title page  --------------------------------------------------i 
Certification page-------------------------------------------ii 
Dedication---------------------------------------------------iii
Acknowledgement--------------------------------------------iv
Abstract -----------------------------------------------------v-vi
Table of content   ------------------------------------------vii-ix
List of table--------------------------------------------------x-xi 

CHAPTER ONE 
Introduction 
1.1 Background of the study -----------------------------1-2
1.2 Statement of  problems ------------------------------2--6
1.3 Objective of the study --------------------------------6--7
1.4 Research question---------------------------------------7
1.5 Significance  of the study ---------------------------8-10
1.6 Scope of the study ------------------------------------11
1.7 Limitation  of the study --------------------------------12
1.8 Definition of  major terms -------------------------13-14

CHAPTER TWO 
Review of relevant/related literature 
2.1 Meaning and nature of  crisis ---------------------15-30
2.2 Crisis Forecasting ----------------------------------30-36
2.3 Crisis management as it affects the Local Government system--- ---------36-37
2.4 Source of crisis ------------------------------------38-46
2.5 Techniques used in avoiding crisis ----------------46-48
2.6 Summary of literature  reviewed---------------------49
Reference -------------------------------------------------50-51

CHAPTER THREE 
Research methodology 
3.1 Sources of 1Data ------------------------------------52
3.2 Population of study----------------------------------52
3.3 Determination of sample size -----------------------53
3.4 Sample Techniques---------------------------------53-54
3.5 Selection and construction of  research instrument--55 
3.6 Administration of research  instruction --------------55
3.7 Instrument  return  rate -------------------------------56

CHAPTER FOUR 
Data Presentation and analysis 
4.1 Presentation of data------------------------------------57
4.2 Analysis of data------------------------------------58-74

CHAPTER FIVE 
Summary of Findings, Recommendation and Conclusion
5.1 Summary of findings ------------------------------75-78
5.2 Recommendations-------------------------------------79
5.3 Conclusion-----------------------------------------80--81
Bibliography ----------------------------------------82-83
Appendix ------------------------------------------84-85
Questionnaires---------------------------------------86-88 

  • Department: Public Administration
  • Project ID: PUB0589
  • Access Fee: ₦5,000
  • Pages: 97 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1,044
Get this Project Materials
whatsappWhatsApp Us