CONSTRUCTION OF A MOBILE REFRIGERATOR
- Department: Mechanical Engineering
- Project ID: MCE0145
- Access Fee: ₦5,000
- Pages: 43 Pages
- Reference: YES
- Format: Microsoft Word
- Views: 1,307
Get this Project Materials
ABSTRACT
This write up is a detain of the process and formulation of plan for the physical realization of the construction of a mobile cooking system. It as divided into chapters, which discussed extensively the practical refrigerator cycle with attention given to constriction factors, working principle and choice of materials. The method used in the fabrication, assembly and arriving as knowing the safety requirement were not left out.
It is strongly believed by the authors that his will make an interesting study for inquisitive minds and collection of fact for future related project.
TABLE OF CONTENTS
Title page
Letter of transmittal
Release page
Signature page
Approval page
Dedication
Acknowledgement
Abstract
Table of contents
CHAPTER ONE
1.0 Introduction
CHAPTER TWO
2.0 Literature Review
CHAPTER THREE
3.0 Theory of Construction and Analysis
3.1 Component Pasts of the Refrigerator
3.2 Theory of Reversed Heal Engineering System Operating on A Cannot Cycle
3.3 Refrigerant
3.4 The Construction Standards and Component Determination
CHAPTER FOUR
4.0 Construction Procedures
4.1 Material Selection
4.2 Tools /Equipment Used
4.3 Construction Method and Procedure (Sequence of Operation
4.4 Laying of Evaporator Ripe (Piping
4.5 Lagging
4.6 Electrical System in the Fridge
4.7 Principles of Operation
CHAPTER FIVE
5.0 Testing and Evolution
CHAPTER SIX
Cost Analysis
6.0 Material Cost
6.2 Labour Cost Recommendation
References
- Department: Mechanical Engineering
- Project ID: MCE0145
- Access Fee: ₦5,000
- Pages: 43 Pages
- Reference: YES
- Format: Microsoft Word
- Views: 1,307
Get this Project Materials