Impact of students work experience scheme(siwes) on the students after completion of the program


  • Department: Secretarial Administration
  • Project ID: SEA0424
  • Access Fee: ₦5,000
  • Pages: 64 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 436
Get this Project Materials
TABLE OF CONTENTS
Title Page---------i
Approval Page--------ii
Declaration--------iii
Dedication---------iv
Acknowledgement-------v
Abstract---------vi
Table of Contents-------vii

CHAPTER ONE – INTRODUCTION
1.1Background of the Study-----
1.2Statement of General Problem----
1.3Objective of the Study------
1.4Research Questions------
1.5    Hypothesis   -      -      -      -      -      -      -        -        -        
1.6Significance of the Study-----
1.7Scope of the Study------
1.8Definition of Terms------
1.9    References                   ------
CHAPTER TWO – REVIEW OF RELATED LITERATURE
2.1Introduction-------
2.2    Conceptual Review------
2.3Empirical Review---¬---
CHAPTER THREE – RESEARCH METHODOLOGY
3.1Introduction-------32
3.2Research Design------32
3.3Area of the Study------32
3.4Population of Study------33
3.5Sample size and Sampling Techniques---33
3.6Instrument for Data Collection----33
3.7Validity of the Instrument-----33
3.8Reliability of the Instrument----34
3.9Method of Data Collection-----34
3.10Method of Data Analysis-----34
CHAPTER FOUR – DATA PRESENTATION AND ANALYSIS
4.0Introduction-------36
4.1Data Presentation and Analysis----36
4.2Characteristics of the Respondents---36
4.3Data Analysis-------39
4.4Testing Hypothesis------46
4.5Summary of Findings------51
4.6Discussion of Findings-----52
CHAPTER FIVE – SUMMARY, CONCLUSION AND RECOMMENDATION
5.0Introduction-------54
5.1Summary--------54
5.2Conclusion--------57
5.3Recommendations------58
References --------61
Appendix--------62
  • Department: Secretarial Administration
  • Project ID: SEA0424
  • Access Fee: ₦5,000
  • Pages: 64 Pages
  • Reference: YES
  • Format: Microsoft Word
  • Views: 436
Get this Project Materials
whatsappWhatsApp Us